Qukaim Electrolytic Polarized Capacitors 20pcs 450V 22µF 105℃ Long Leads Axial Electrolytic Polarized Capacitors for Tube Amplifier, High Voltage

$23.95
FREE Shipping

Qukaim Electrolytic Polarized Capacitors 20pcs 450V 22µF 105℃ Long Leads Axial Electrolytic Polarized Capacitors for Tube Amplifier, High Voltage

  • Brand: Unbranded

Qukaim Electrolytic Polarized Capacitors 20pcs 450V 22µF 105℃ Long Leads Axial Electrolytic Polarized Capacitors for Tube Amplifier, High Voltage

  • Brand: Unbranded
RRP: $41.95
Price: $23.95
You save: $18.00 (42%)
Sold by:
$23.95
FREE Shipping

In stock

We accept the following payment methods

Description

Features Stable Performance Assurance: Designed for reliability, these electrolytic capacitors ensure consistent performance in various electronic applications Clear Specifications Marked: Each capacitor features clearly marked specifications for easy identification, simplifying your project setup and enhancing usability Superior Heat Resistance: Built to withstand high temperatures, these polarized capacitors exhibit low leakage, low loss, and low impedance for optimal efficiency Ideal for Professionals: A perfect choice for electronic professionals and enthusiasts alike, these capacitors deliver exceptional performance for audio and other electronic circuits Versatile Applications: Suitable for a wide range of electronic projects, these 450V capacitors can be utilized in tube amplifiers and various audio equipment Features: 1、 electrolytic capacitors with stable performance 2、The specifications of the capacitors is marked on its , convenient to use 3、Heat resisting, low leakage, low loss and low impedance 4、Great choice for electronic profionals or enthusiasts 5、Suitable for a wide range of electronic applications Specification: Features: electrolytic capacitors with stable performance. The specifications of the capacitors is marked on its , convenient to use. Heat resisting, low leakage, low loss and low impedance. Great choice for electronic profionals or enthusiasts. Suitable for a wide range of electronic applications. Specification: Working Voltage: DC 450V Surge voltage: DC 500V Value: 22uf Capacitance Tolerance: ±20% Operating temperature: 105℃ Dissipation Factor: between0.24 at 20℃/120Hz Dimensions: Approx. 21 x 1m / 0.83 x 0.51in Lead type length: Tin plating copper layer Lead length: 27mm / 1.1inch Type: Polarized Quantity: 20pcs Weight: Approx. 79g Package Included: 20 x Electrolytic Capacitor Package List
  • Fruugo ID: 405372327-859896452
  • EAN: 9301540015686

Product Safety Information

Please see the product safety information specific to this product outlined below

The following information is provided by the independent third-party retailer selling this product.

Product Safety Labels

CE Mark
Safety Warnings: Please do not allow your child to handle this product alone to avoid swallowing or other injuries; adult supervision is recommended.
Ingredients: As shown in the figure

Delivery & Returns

Dispatched within 24 hours

  • STANDARD: FREE - Delivery between Fri 31 October 2025–Thu 06 November 2025 - FREE

Shipping from China.

We do our best to ensure that the products that you order are delivered to you in full and according to your specifications. However, should you receive an incomplete order, or items different from the ones you ordered, or there is some other reason why you are not satisfied with the order, you may return the order, or any products included in the order, and receive a full refund for the items. View full return policy

Product Compliance Details

Please see the compliance information specific to this product outlined below.

The following information is provided by the independent third-party retailer selling this product.

Manufacturer
The following information outlines the contact details for the manufacturer of the relevant product sold on Fruugo.

  • Shenzhenshi Desheng Wangluo Keji Youxian Gongsi
  • Shenzhenshi Desheng Wangluo Keji Youxian Gongsi
  • NO,606-23-220,MeinianGuojiGuangChangZhaoshangJiedaoNanHaidadao yixiShenzhenGuangdong
  • Shenzhen
  • CN
  • 518000
  • GoodLuck856@163.com
  • 8613164761511

Responsible Person in the EU
The following information outlines the contact information for the responsible person in the EU. The responsible person is the designated economic operator based in the EU who is responsible for the compliance obligations relating to the relevant product sold into the European Union.

  • SINO-SEAR GmbH
  • SINO-SEAR GmbH
  • Feuerbachstrasse 11, 14471 Potsdam, Germany
  • Potsdam
  • DE
  • 14471
  • info@sino-sear.com
  • 4933195130908